Mobile Regional Airport

Project Photos

Location: Mobile, AL
Client: Mobile Airport Authority

Volkert has served as general consultant to the Mobile Airport Authority (MRA) since 1969. We have provided engineering and design services as well as construction oversight and inspection services, airfield rehabilitation, security systems, and utilities design.

Our services have included the design of new airfield pavements for runways, taxiways and access roads as well as the resurfacing of existing ones. We have provided design services for rehabilitation of infrastructure, lighting, security systems, fueling facilities, utilities, and terminal buildings. We have applied for and secured appropriate permits and FAA grants over the history of our service with Mobile Regional Airport. Since 2009, we have conducted design and construction engineering inspection services to resurface: RW 18/36; TW R; and terminal and airport entrance roads.

Additional airfield improvements have included:

  • security lighting upgrades
  • replacement of the beacon, tower, and two electrical panels
  • airfield drainage improvements
  • multiple culvert replacements
  • emergency generators

Scope of Work: Airport Layout Plans, Aviation Engineering, Runway, taxiway, and pavement design, FAA Coordination and Grant Applications, Construction Engineering and Inspection (CEI), Lighting Design, Drainage Design, Security System Design, Permitting and Regulatory Communication