Schillinger Rd and Airport Blvd Signal Synchronization

Project Photos

Location: Mobile, AL
Client: Mobile County Commission

Mobile County Commission contracted Volkert to provide a system analysis for the existing signals and develop recommendations for system improvements on one of Mobile’s busiest thoroughfares. This street traverses densely developed commercial and residential areas and operates at capacity during and near peak times. The multilane corridor has 17 intersections within the City of Mobile and has often been plagued by congestion and delay.

Based upon aerial photographs supplied by the county, Volkert developed signal plans for the project limits for both peak and off-peak times. Initial signal timing calculations were conducted using traffic count information from the County. Construction plans consisted of traffic control details.  Volkert also provided recommendations for new signal equipment and made recommendations concerning communication between the new system and the county offices.

Scope of Work: Traffic Analysis, Signalization Design, Traffic Engineering, Lighting Design, Public Outreach